BUREX

Civil Structures

Monolithic concrete · foundations · reinforced concrete

We design and build civil structures for industry — foundations, reinforced concrete structures and monolithic pours. From excavation to a load-bearing structure ready for the hall assembly.

What we build
EN 1992 · Eurocode 2 EN 206 Monolithic pours Industrial floors Reinforced concrete

01 / What we build

Civil structures for industry

Foundation and load-bearing concrete structures — we design, excavate, reinforce and pour. In-house, with one team, from start to finish.

Foundations

Monolithic foundation slabs, footings and strip footings for industrial halls, process equipment and crane runways. From excavation and shoring to a reinforced, poured foundation.

  • Monolithic foundation slabs
  • Footings and strip footings
  • Excavation and shoring

Reinforced concrete structures

Columns, beams, load-bearing walls and skeleton structures for industrial halls and warehouses. Designed to the Eurocodes, built by our own team.

  • Columns and beams
  • Load-bearing walls
  • Skeleton structures

Monolithic concrete pours

Large-scale pours of foundations and load-bearing structures in a single cast. Concrete quality control at every stage — from batching to curing.

  • Single-cast pours
  • Concrete quality control
  • Concrete curing

Industrial floors

Joint-free concrete floors for production halls and warehouses with increased load capacity and a surface matched to your operation.

  • Heavy-duty floors
  • Fibre concrete and mesh reinforcement
  • Surface finishing

02 / Technical data

Design & quality

We build to current European standards and control quality at every stage.

Parameter Specification
01 Structural design EN 1990, EN 1991 and EN 1992 (Eurocodes)
02 Concrete EN 206 — strength classes per project documentation
03 Reinforcement EN 10080 — reinforcing steel, mesh and bars
04 Execution EN 13670 — execution of concrete structures
05 Scope of supply From excavation to load-bearing structure and finishing
06 Delivery Own team, machinery and control testing

03 / Projects

Completed buildings

Photo documentation from our sites. Every structure is a custom project built to the customer's documentation.

04 / Sister company

Precast concrete structures

Need a floor slab or hall skeleton built by dry assembly? Our sister company PREFA Michalovce supplies precast concrete.

PREFA Michalovce s.r.o. — our sister company — produces prestressed SPIROLL floor slabs, road panels and is preparing skeleton structures for industrial halls. If you don't want a steel structure, we can build the hall in precast concrete instead of a monolithic pour.

PREFA Michalovce — precast structures

05 / FAQ

Frequently asked questions

Answers to the questions we get most often. If yours is missing, give us a call — we are happy to help.

What do BUREX civil structures include?

We build foundation structures (monolithic slabs, pads and strips under halls and crane runways), reinforced concrete structures (columns, beams, load-bearing walls, skeleton systems), monolithic concreting and industrial floors with increased load capacity.

Which standards do you design concrete structures to?

Structures are designed to STN EN 1990, STN EN 1991 and STN EN 1992 (Eurocodes), concrete to STN EN 206, reinforcement to STN EN 10080 and execution to STN EN 13670. Every structure has a structural assessment.

Do you also build foundations for cranes and crane runways?

Yes, that is one of our specialisations. We design and build foundation pads and strips exactly to the load from the crane and crane runway, with anchor elements and tolerances per the project.

What load capacity of industrial floors can you build?

Industrial floors are designed to the operating load — from light warehouses (5 kN/m²) to heavy industry and VZV operations (50+ kN/m²). We use fibre concrete, reinforcing mesh and surface treatments per requirements.

How long does building foundations and concrete structures take?

It depends on scope — foundations for one crane take 1–2 weeks, a complete hall with foundations, columns and floor takes 4–8 weeks depending on size and weather. We plan work in coordination with the steel structure installation.

Non-binding technical design

Inquiry for a civil structure

Need foundations, a reinforced concrete structure or the load-bearing part of a building? Send us your requirements — we will prepare a technical design and a price quote.

+421 905 655 646 burex@burex.sk